Blog Archives

Rockwell Hall Addition

This project is an addition to the existing Rockwell Hall to support the Minor in Business degree program. The facility will be located on the west side of Rockwell, with […]


Indoor Practice Facility Renovation & Addition

SBEC was selected by the University of Colorado at Boulder and Sink Combs Dethlefs to provide mechanical design services for the 32,700 GSF addition to the Coors Event Center (CEC) […]


Brown Hall Engineering Building Renovation & Addition

SBEC provided mechanical and electrical design services for the design and construction of a 70,000 GSF addition that will be connected to the existing building by a multi-level enclosed bridge […]


Institute of Behavioral Science

SBEC is the Mechanical Engineer of Record for this project which was designed to consolidate 9 different physical locations for the IBS program into a single facility. The new facility […]


Leeds School of Business Renovation & Expansion

SBEC is the mechanical and electrical Engineer of Record for the Leeds School of Business Renovation & Addition, which became LEED® Gold Certified in 2007 and included the renovation of […]


Education Facility II / Academic Office East

The Education Facility II / Academic Office East project involved construction of a new facility complex designed to bring together campus faculty, students, and programs in two interconnected physical structures. […]