enginnering project

SBEC provided mechanical and electrical engineering services for the 2012 Prairie Middle School Bond Renovation for various mechanical and plumbing system replacements and upgrades.

SBEC’s specific scope of work included:

  • Air cooled chiller upsizing and replacement
  • Various different types, sizes, and capacities of air handing unit(s) replacement
  • Medium pressure fiberglass ductwork replacement
  • VAV terminal replacement
  • Pneumatic to Direct Digital Control (DDC) upgrades
  • Science classroom gas shut off controls upgrades
  • Domestic hot water recirculating system replacement
  • Upgrade fire alarm system
Area:180,240 GSF