enginnering project
/

As the prime consultant, SBEC provided mechanical and electrical engineering design services for an active pressure control system for the existing pharmacy to comply with state health department requirements.

This included adding supply air fan and pressure controls to maintain a controlled positive pressure in the existing Pharmacy.

SBEC added electrical to support the new mechanical equipment.  The project included minor lighting modifications.

Cost:$65,000
Area:2,600 GSF