SBEC provided mechanical and electrical engineering services for the 2012 Prairie Middle School Bond Renovation for various mechanical and plumbing system replacements and upgrades.
SBEC’s specific scope of work included:
- Air cooled chiller upsizing and replacement
- Various different types, sizes, and capacities of air handing unit(s) replacement
- Medium pressure fiberglass ductwork replacement
- VAV terminal replacement
- Pneumatic to Direct Digital Control (DDC) upgrades
- Science classroom gas shut off controls upgrades
- Domestic hot water recirculating system replacement
- Upgrade fire alarm system