SBEC provided mechanical and electrical engineering design services for the new chiller and boiler plant. Specific scope of work included:

  • Direct-bury pre-insulated steam and condensate mains
  • Distribution system, feedwater system and steam header sized for a future build-out to 1,900 BHP
  • New central 800-ton chiller plant with plate and frame hydronic economizer
  • Variable speed primary-secondary chilled water pumping
  • New steam to water hot water heat exchanger
  • Campus distribution
  • Upgrade to central steam boiler plant
  • New 400 BHP high-pressure steam boiler
  • New deaerator feedwater
Cost:$2,000,000
Area:62,000 GSF