enginnering project
/

SBEC provided complete design services and construction documents for the demolition and relocation of the existing HVAC, plumbing, fire protection and process piping systems within the factory to accommodate the new paint booth.

The paint booth is constructed of double wall insulated pre-coated white sheet steel and structural steel. The paint booth utilizes100% outside air make-up air units, face and by-pass steam heating coils, high plume exhaust fans pre-action fire sprinkler system, dynamic paint booth pressure control and NFPA-33 safety interlocks for painting equipment.

SBEC’s additional scope of work included:

  • Paint spray booth is self-supporting, constructed of double wall insulated pre-coated white sheet steel and structural steel
  • 100% outside air make-up air units
  • Face and by-pass steam heating coils
  • High plume exhaust fans
  • Pre-action fire sprinkler systems
  • Dynamic paint booth pressure control
  • NFPA-33 safety interlocks for painting equipment

 

Cost:$1,200,000
Area:4,000 GSF