The Molecular, Cellular & Developmental Biology Building (MCDB) is a multi-story university building that houses teaching/wet labs and support facilities for molecular, cellular and developmental biology research. The ground floor […]
Addressing the need for functional research and support space, a three-story addition was designed to connect the existing Microbiology Building and provide additional square footage for research activities that include […]
SBEC was the prime consultant for this project. The mechanical system featured redundant ventilation and heating systems. The air handling units contained HEPA filtration, heat recovery coils, hydronic heating coils, […]
This project consisted of the design of a leading edge Class 10,000 (ISO 7) cell therapy clean room facility for spinal cord injured patients. Included design of gown and pre-gown […]
The Colorado Department of Public Health and Environment (CDPHE) is planning to design and build Triage and Response BSL-3 Laboratories to support their mission of “protecting and preserving the health […]
The purpose of the Redundant Data Center project was to create a second data center for Parkview Medical Center, geographically remote from the primary data center located in the main […]
In addition to assisting with master planning validation, SBEC provided mechanical and electrical engineering and design services for the renovation of approximately 109,000 GSF and 4-story addition of 88,000 GSF to the […]