Blog Archives

Red Hawk Elementary School

SBEC was selected by RB+B Architects to design the mechanical systems necessary to support this new 71,000 GSF stand alone elementary school. The new building was designed as a high-performance […]


Eaglecrest High School Addition

This project entailed adding multiple additions to the existing 330,000 GSF building to include new lecture hall space, twelve new classrooms, several teachers’ offices, restrooms and a new entrance and […]


Bethke Elementary School

Bethke is a prototype elementary school that incorporates “micro-load” building design, which utilizes a high-efficiency building envelope, daylighting design and reduces internal gains to minimize heating and cooling system capacities. […]


Elm Residence and Dining Hall

SBEC is provided mechanical and electrical engineering and design services for the new 100,000 square-foot Elm Residence and Dining Hall facility. The 200-bed residence hall began design in early 2013 […]


Rockwell Hall Addition

This project is an addition to the existing Rockwell Hall to support the Minor in Business degree program. The facility will be located on the west side of Rockwell, with […]


Indoor Practice Facility Renovation & Addition

SBEC was selected by the University of Colorado at Boulder and Sink Combs Dethlefs to provide mechanical design services for the 32,700 GSF addition to the Coors Event Center (CEC) […]


Brown Hall Engineering Building Renovation & Addition

SBEC provided mechanical and electrical design services for the design and construction of a 70,000 GSF addition that will be connected to the existing building by a multi-level enclosed bridge […]


Institute of Behavioral Science

SBEC is the Mechanical Engineer of Record for this project which was designed to consolidate 9 different physical locations for the IBS program into a single facility. The new facility […]


Leeds School of Business Renovation & Expansion

SBEC is the mechanical and electrical Engineer of Record for the Leeds School of Business Renovation & Addition, which became LEED® Gold Certified in 2007 and included the renovation of […]


Education Facility II / Academic Office East

The Education Facility II / Academic Office East project involved construction of a new facility complex designed to bring together campus faculty, students, and programs in two interconnected physical structures. […]