Blog Archives

Libby Hall Renovation

SBEC was selected to design the renovation of Libby Hall, a freshman dormitory and dining facility built in 1953.  The kitchen and cafeteria had not undergone any major renovation in […]


Jefferson High School Renovation

SBEC was selected to provide design services for an entire mechanical, electrical and plumbing systems replacement to support the renovation of the existing high school.  Phase 1 consisted of the […]


For Blind Children

SBEC provided mechanical and electrical engineering design services for a new educational facility to serve visually impaired children.   The facility includes classrooms, dining, recreational, meeting and administrative spaces. SBEC’s specific […]


New Boiler Plant

SBEC provided mechanical and electrical engineering design for a new boiler plant at Parkview Medical Center. Specific scope of work included: Design of power distribution and grounding for new boilers […]


College Center Expansion & Renovation

SBEC provided mechanical, electrical and consulting engineering design services for the complete renovation of the existing two story Pueblo Community College, College Center Building and three building additions. The project […]


Building 500 AHU Replacement

This project consisted of a Master Plan of the entire Building 500 to assess the current condition and prioritize the upgrade and replacement of 33 air handling units in a […]


HVAC Renovation Building 758

In 2012, SBEC was selected as the prime consultant to provide HVAC systems up-grades for Colorado Community College System Building 758. The project improved the operation, efficiency and comfort control […]


Fire Protection Upgrades

In 2011, SBEC was contracted to design the mechanical, electrical, fire protection and fire alarm systems for three existing buildings located on the Auraria Higher Education Center campus totaling in […]


Farrand Hall Renovation

In 2001, SBEC was selected to design the renovation of Farrand Hall’s kitchen area and dining facility.  The renovation featured an “industrial” theme, with industrial lighting fixtures, exposed ductwork and […]


Chilled Water Master Plan

In 2009, SBEC was contracted directly by Colorado School of Mines to develop a south campus chilled water micro master plan since the chilled water system for south campus is largely decentralized […]