Blog Archives

Since 2006, SBEC has successfully completed more than sixty (60) projects for Lockheed Martin Corporation, notably projects for the Lockheed Martin Space Systems (LMSS) Business Unit including projects supporting DoD, NASA […]


Building 1 Wing 1 Clean Room Demo & Lab Remodel

In collaboration with NIST, the A/E team, led by SBEC in the prime consultant role, authored and issued with the construction documents a performance specification for Building 1 Wing 1, […]


LSTTB Building United Launch Alliance Laboratory Consolidation

This was an existing building owned by confidential aerospace contractor that was remodeled for the consolidation of several laboratories operated by the United Launch Alliance. The project consisted of several […]


Coherent Tech Building

This project consisted of a tenant finish for an existing single-floor, slab-on-grade industrial building, divided into two phases. This project was divided into two phases, with the first phase being […]


Collaborative Human Immersive Laboratory

In 2010, SBEC was contracted to provide HVAC, plumbing, and fire protection design for the remodel of approximately 5,900 square feet on the first floor of an existing 95,000 GSF […]


Global Positioning Facility (GPF) III

The project consists of a remodel of a portion of the existing FAB building. The remodeled area is approximately 40,000 square feet located on a secured aerospace defense contractor campus. The […]


Pueblo West Emergency Department Redundant Data Center

The purpose of the Redundant Data Center project was to create a second data center for Parkview Medical Center, geographically remote from the primary data center located in the main […]