SBEC’s engineers have experience working on Sandoz’s Broomfield, Colorado campus.  To date, SBEC has completed eight (8) projects on the Broomfield campus – supporting SNC-Lavalin as a subconsultant, as well […]


Building 7 Innovation Center

In 2010, Covidien – a leading manufacturer of medical devices and supplies, diagnostic imaging agents and pharmaceuticals – selected SBEC to provide mechanical engineering design services for their new Building […]


Water Treatment Plant

In 2011, SBEC was selected to provide HVAC design services (including temperature controls) and plumbing design services for the Rueter-Hess Water Treatment plant, located near Parker, Colorado. The project consisted […]


Chiller and Boiler Plant Upgrade

SBEC provided mechanical and electrical engineering design services for the new chiller and boiler plant. Specific scope of work included: Direct-bury pre-insulated steam and condensate mains Distribution system, feedwater system […]


Clean Room

SBEC was selected to assist Synthes – a leading global medical device company – with the renovation of a Class 10,000 (ISO 7) clean room and adjacent Class 100,000 (ISO […]


Admin & Chiller Replacement

This project consisted of two separate projects being designed concurrently.  SBEC served as the prime consultant for both projects. The project consisted of a complete gut remodel of the Engineering […]


Boulder Community Foothills Hospital was the first LEED Certified hospital in the nation, achieving LEED Silver in 2004. SBEC is the Mechanical Engineer of Record for the new 60-bed full […]


Semi-Conductor Tool Manufacturing

This project in Hillsboro, Oregon, entailed the expansion of an existing facility and the design and construction of a new 177,000 GSF manufacturing clean room facility including 48,000 sq. ft. […]


Worner Campus Center

SBEC provided mechanical and electrical engineering and consulting services for this project which consisted of the renovation of an existing college campus center. Worner Center is Colorado College’s student union […]


Marquez Hall Petroleum Engineering Building

Marquez Hall – a state-of-the-art $28 million facility for pioneering teaching, research and service – provided for expanded student enrollment and increased faculty research activities that demand the kind of […]