Blog Archives

Coherent Tech Building

This project consisted of a tenant finish for an existing single-floor, slab-on-grade industrial building, divided into two phases. This project was divided into two phases, with the first phase being […]


Collaborative Human Immersive Laboratory

In 2010, SBEC was contracted to provide HVAC, plumbing, and fire protection design for the remodel of approximately 5,900 square feet on the first floor of an existing 95,000 GSF […]


Global Positioning Facility (GPF) III

The project consists of a remodel of a portion of the existing FAB building. The remodeled area is approximately 40,000 square feet located on a secured aerospace defense contractor campus. The […]


Space Operations Simulation Center

This project is a LEED v2.2 Gold Certified high-bay advanced test facility addition to an existing 1960s masonry building containing test labs and office space. The project had an accelerated […]


Orion Paint Booth

SBEC provided complete design services and construction documents for the demolition and relocation of the existing HVAC, plumbing, fire protection and process piping systems within the factory to accommodate the […]


Molecular, Cellular, Developmental Biology (MCDB) Building Phases I and II

The Molecular, Cellular & Developmental Biology Building (MCDB) is a multi-story university building that houses teaching/wet labs and support facilities for molecular, cellular and developmental biology research. The ground floor […]


Microbiology Addition

Addressing the need for functional research and support space, a three-story addition was designed to connect the existing Microbiology Building and provide additional square footage for research activities that include […]


Ross Hall Animal Facility

SBEC was the prime consultant for this project. The mechanical system featured redundant ventilation and heating systems. The air handling units contained HEPA filtration, heat recovery coils, hydronic heating coils, […]


Pro-neuron Cell Center

This project consisted of the design of a leading edge Class 10,000 (ISO 7) cell therapy clean room facility for spinal cord injured patients. Included design of gown and pre-gown […]


Triage & Rapid Response Laboratories

The Colorado Department of Public Health and Environment (CDPHE) is planning to design and build Triage and Response BSL-3 Laboratories to support their mission of “protecting and preserving the health […]