Blog Archives

Water Treatment Plant

In 2011, SBEC was selected to provide HVAC design services (including temperature controls) and plumbing design services for the Rueter-Hess Water Treatment plant, located near Parker, Colorado. The project consisted […]


Admin & Chiller Replacement

This project consisted of two separate projects being designed concurrently.  SBEC served as the prime consultant for both projects. The project consisted of a complete gut remodel of the Engineering […]


National Archives and Records Administration

SBEC was hired by the GSA under the IDIQ to provide mechanical design engineering for the federal building constructed for the purpose of storing national documents with specific temperature/humidity requirements. […]


HVAC Replacement

SBEC has provided many engineering services for the Colorado Department of Health Services Ft. Logan campus for nearly 10 years. As the prime consultant, SBEC provided mechanical and electrical engineering design […]


Building 41 Electrical Distribution Systems Replacement

SBEC was selected to provide an existing conditions study of the electrical design for Denver Federal Center’s Building 41 (B41) located in Lakewood, Colorado as part of the GSA Region […]


Region 8 IDIQ

In 2013, SBEC was awarded an IDIQ contract for the General Services Administration Region 8. Services provided under this contract include architectural design services for repairs, alterations, expansions and renovations […]


IDIQ

In 2008, SBEC was awarded the Center’s for Disease Control IDIQ contract for multiple task orders for projects involving various combinations of architectural, security, laboratory, interior design, structural, mechanical, electrical, […]


Building 1 Wing 1 Clean Room Demo & Lab Remodel

In collaboration with NIST, the A/E team, led by SBEC in the prime consultant role, authored and issued with the construction documents a performance specification for Building 1 Wing 1, […]


Coherent Tech Building

This project consisted of a tenant finish for an existing single-floor, slab-on-grade industrial building, divided into two phases. This project was divided into two phases, with the first phase being […]


Collaborative Human Immersive Laboratory

In 2010, SBEC was contracted to provide HVAC, plumbing, and fire protection design for the remodel of approximately 5,900 square feet on the first floor of an existing 95,000 GSF […]