SBEC was selected to provide an existing conditions study of the electrical design for Denver Federal Center’s Building 41 (B41) located in Lakewood, Colorado as part of the GSA Region […]
This was an existing building owned by confidential aerospace contractor that was remodeled for the consolidation of several laboratories operated by the United Launch Alliance. The project consisted of several […]
This project consisted of a tenant finish for an existing single-floor, slab-on-grade industrial building, divided into two phases. This project was divided into two phases, with the first phase being […]
In 2010, SBEC was contracted to provide HVAC, plumbing, and fire protection design for the remodel of approximately 5,900 square feet on the first floor of an existing 95,000 GSF […]
The project consists of a remodel of a portion of the existing FAB building. The remodeled area is approximately 40,000 square feet located on a secured aerospace defense contractor campus. The […]
This project is a LEED v2.2 Gold Certified high-bay advanced test facility addition to an existing 1960s masonry building containing test labs and office space. The project had an accelerated […]
SBEC provided complete design services and construction documents for the demolition and relocation of the existing HVAC, plumbing, fire protection and process piping systems within the factory to accommodate the […]
This project consisted of the design of a leading edge Class 10,000 (ISO 7) cell therapy clean room facility for spinal cord injured patients. Included design of gown and pre-gown […]
The Colorado Department of Public Health and Environment (CDPHE) is planning to design and build Triage and Response BSL-3 Laboratories to support their mission of “protecting and preserving the health […]
This project entailed adding multiple additions to the existing 330,000 GSF building to include new lecture hall space, twelve new classrooms, several teachers’ offices, restrooms and a new entrance and […]