SBEC provided design services through a Design/Build Contractor led delivery method to provide a tenant fit-up of the FeRx Pharmaceutical Company at the Fitzsimons Bioscience Building I. The fit-up included […]
SBEC provided mechanical, electrical and consulting engineering design services for the new multi-story teaching and research building. Specific scope included: Multi-phased, build-out construction 850-ton evaporative DX rooftop custom air handling […]
SBEC provided mechanical and electrical engineering design services for the Amgen cold room HVAC renovation of three (3) existing cold rooms (Class 100,000 clean rooms) totaling approximately 2,000 ft2 maintained […]
Located at the corner of 33rd Street and Walnut Street in Boulder, Colorado, this new building was constructed to be the headquarters of Amgen Colorado, Incorporated, a leading biotechnology company. […]
In 2010, Covidien – a leading manufacturer of medical devices and supplies, diagnostic imaging agents and pharmaceuticals – selected SBEC to provide mechanical engineering design services for their new Building […]
In 2011, SBEC was selected to provide HVAC design services (including temperature controls) and plumbing design services for the Rueter-Hess Water Treatment plant, located near Parker, Colorado. The project consisted […]
SBEC provided mechanical and electrical engineering design services for the new chiller and boiler plant. Specific scope of work included: Direct-bury pre-insulated steam and condensate mains Distribution system, feedwater system […]
This project consisted of two separate projects being designed concurrently. SBEC served as the prime consultant for both projects. The project consisted of a complete gut remodel of the Engineering […]
Boulder Community Foothills Hospital was the first LEED Certified hospital in the nation, achieving LEED Silver in 2004. SBEC is the Mechanical Engineer of Record for the new 60-bed full […]
This project in Hillsboro, Oregon, entailed the expansion of an existing facility and the design and construction of a new 177,000 GSF manufacturing clean room facility including 48,000 sq. ft. […]